FATRAFOL 810/V (810) is based on PVC-P and reinforced with a polyester scrim. It resists UV radiation and can be directly exposed to weathering. It is designed for mechanically fastened systems with the waterproofing freely exposed to weather, without protective or wear layers.
Verified by testing and by real-world construction experience.
The waterproofing membrane retains its properties at temperatures from -30 to +80 °C.
Supply of membranes including auxiliary and finishing components.
The membrane is suitable for use on all types of roof structures and materials.
The membrane is long-term resistant to UV radiation and common environmental influences.
Simple and fast membrane installation, easy maintenance.

Thickness | Width (mm) | Length (m) | Quantity per roll (m2) |
|---|---|---|---|
1,2 | 1025 | 25 | 26,625 |
1,2 | 1650 | 25 | 41,25 |
1,2 | 2050 | 25 | 51,25 |
1,5 | 1025 | 20 | 20,50 |
1,5 | 1650 | 20 | 33 |
1,5 | 2050 | 20 | 41 |
1,8 | 1025 | 16,5 | 16,913 |
1,8 | 1650 | 16,5 | 27,225 |
1,8 | 2050 | 16,5 | 33,825 |
2,0 | 1025 | 15 | 15,375 |
2,0 | 1650 | 15 | 24,75 |
2,0 | 2050 | 15 | 30,75 |
By agreement between the manufacturer and the customer, the membrane can also be produced in other sizes.
Thickness | Width (mm) | Length (m) | Quantity per roll (m2) |
|---|---|---|---|
1,2 | 1300 | 25 | 32,5 |
1,2 | 1500 | 25 | 37,5 |
1,2 | 2050 | 25 | 51,25 |
1,5 | 1300 | 20 | 26 |
1,5 | 1500 | 20 | 30 |
1,5 | 2050 | 20 | 41 |
1,8 | 1300 | 16,5 | 21,45 |
2,0 | 1300 | 15 | 19,5 |
2,0 | 2050 | 15 | 30,75 |
By agreement between the manufacturer and the customer, the membrane can also be produced in other sizes.


The membranes may be installed on construction sites only by specialised, suitably trained companies. The membranes are applied in accordance with the principles set out in the FATRAFOL-S construction specification.

Installation of the FATRAFOL system on a flat roof, including preparation, membrane welding and details.
8m 45s
Demonstration of welding and securing the profile to ensure roof watertightness.
5m 23s
Installation of a roof drain into the FATRAFOL system, including substrate preparation, fitting and welding for reliable roof drainage.
5m 23s
Installation of a closed preformed corner in the FATRAFOL system involves substrate preparation, precise fitting and welding to the membrane, ensuring lasting watertightness of the roof detail.
3m 08s
Finishing the penetration in the FATRAFOL membrane for proper sealing and long-term reliability of the detail.
7m 45s
Demonstration of welding and securing the profile to ensure roof watertightness.
1m 11s
Contact a Fatra representative who will help you choose.
The Insulation Studio provides technical support, expert consultations and answers to specific questions about FATRAFOL membranes. Answered directly by Fatra experts.